Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 16, 2025

12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size

Preserved file SHA-2569bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0

Indexed text · page 127

Show all pages
Page 127

Page 127 1 transformer. That's got to be removed for all this 2 to be installed on the south side. 3 Q. Now, with respect to maintaining power 4 and being -- service during a move to any such area, 5 would that plan that you were just discussing be able 6 to support -- be able to support the continuation of 7 service during the time that you move it in that 8 area? 9 A. They should be -- you should be able to 10 continue supporting service as this is being 11 installed, whether it is installed in the present 12 location or if you shift it, you know, just slightly 13 north and west or whether it gets -- 14 (Connection lost.) 15 MR. TURTELTAUB: I think we have a 16 freeze here. 17 CHAIRMAN NEUER: We lost him. 18 MR. TURTELTAUB: I think we lost him. 19 Mr. Blanton, can you hear us? 20 CHAIRMAN NEUER: The screen is blank. 21 MR. TURTELTAUB: I'm seeing his 22 picture, but it's frozen right now. 23 CHAIRMAN NEUER: I'm seeing a blank 24 screen with his name on it. 25 MS. PORTER: Yes, I see him frozen.

File revisions (1)