Supporting Documentation · Jan 16, 2025
12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size
9bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0Indexed text · page 52
Show all pagesPage 52 1 could alter your plans to preserve as many as 2 possible. 3 Because right now, the way it looks to 4 me, in my -- my view of the site, it looks like you 5 targeted the largest, oldest trees on the site to be 6 removed. 7 And so it -- you know, it just -- it's 8 a disconnect for me. But I don't have all of the 9 information that you do. 10 Q. Thank you. 11 And are you aware of, in connection 12 with this application, the need for the new equipment 13 to locate -- to be located on the site in close 14 proximity to the existing equipment? 15 A. I'm not aware of that, you know, the 16 methods that are -- that are necessary. 17 My understanding of electric 18 transmission is pretty much confined to plugging into 19 an outlet. 20 So I don't begin to, you know, 21 understand or even -- my ability to comment on what 22 your equipment needs are on the site and where they 23 should be placed. 24 It's not a large site. You probably 25 don't have a lot of opportunities. But if you do
File revisions (1)
- Sep 29, 2026
9bbf98ce9f61680,485 bytes