Supporting Documentation · Jan 22, 2025
240916_40 ERW Stormwater Report FULL
9a66bf2e8c2d4fc2c8f317ad8157caa07e5a39c6bf88816279bf04e1be4ab375Indexed text · page 213
Show all pagesNJ DEP 2-hr WQ Rainfall=1.25"240913_40 ERW Waymaker Proposed Printed 9/16/2024Prepared by Colliers Engineering & Design Page 205HydroCAD® 10.20-2g s/n 04431 © 2022 HydroCAD Software Solutions LLC Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2,878 sf 100.00% Impervious Runoff Depth=1.03"Subcatchment 1S: 2BP-I Flow Length=75' Slope=0.0140 '/' Tc=1.1 min CN=98 Runoff=0.21 cfs 0.006 af Runoff Area=9,508 sf 100.00% Impervious Runoff Depth=1.03"Subcatchment EX 1-I: Flow Length=149' Tc=1.6 min CN=98 Runoff=0.68 cfs 0.019 af Runoff Area=34,310 sf 0.00% Impervious Runoff Depth=0.09"Subcatchment EX 1-P: Flow Length=233' Tc=10.4 min CN=75 Runoff=0.13 cfs 0.006 af Runoff Area=33,427 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment EX 2-P: Flow Length=251' Tc=10.1 min CN=74 Runoff=0.10 cfs 0.005 af Runoff Area=12,817 sf 0.00% Impervious Runoff Depth=0.10"Subcatchment EX 3 - P: Flow Length=109' Tc=7.8 min CN=76 Runoff=0.06 cfs 0.002 af Runoff Area=2,919 sf 100.00% Impervious Runoff Depth=1.03"Subcatchment PR 1A-I: Flow Length=149' Tc=1.6 min CN=98 Runoff=0.21 cfs 0.006 af Runoff Area=21,722 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR 1A-P: Flow Length=395' Tc=10.5 min CN=74 Runoff=0.06 cfs 0.003 af Runoff Area=6,622 sf 0.00% Impervious Runoff Depth=0.45"Subcatchment PR 1B-P: Tc=6.0 min CN=89 Runoff=0.21 cfs 0.006 af Runoff Area=6,039 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR 2A-P: Flow Length=81' Slope=0.3000 '/' Tc=2.7 min CN=74 Runoff=0.02 cfs 0.001 af Runoff Area=5,659 sf 100.00% Impervious Runoff Depth=1.03"Subcatchment PR 2C-I: Flow Length=86' Slope=0.0230 '/' Tc=1.0 min CN=98 Runoff=0.41 cfs 0.011 af Runoff Area=21,408 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR 2C-P: Flow Length=100' Slope=0.0200 '/' Tc=9.4 min CN=74 Runoff=0.07 cfs 0.003 af Runoff Area=10,406 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR 3 - P: Flow Length=109' Tc=7.8 min CN=74 Runoff=0.03 cfs 0.001 af Runoff Area=8,642 sf 100.00% Impervious Runoff Depth=1.03"Subcatchment PR-2B-I: Flow Length=75' Slope=0.0140 '/' Tc=1.1 min CN=98 Runoff=0.62 cfs 0.017 af Runoff Area=1,446 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR-2B-P: Flow Length=114' Tc=8.0 min CN=74 Runoff=0.00 cfs 0.000 af Inflow=0.67 cfs 0.025 afReach
in CN=98 Runoff=0.62 cfs 0.017 af Runoff Area=1,446 sf 0.00% Impervious Runoff Depth=0.07"Subcatchment PR-2B-P: Flow Length=114' Tc=8.0 min CN=74 Runoff=0.00 cfs 0.000 af Inflow=0.67 cfs 0.025 afReach 1R: TOP Outflow=0.67 cfs 0.025 af Inflow=0.67 cfs 0.029 afReach 2R: CHANNEL Outflow=0.67 cfs 0.029 af Inflow=0.67 cfs 0.032 afReach 3R: TOTAL Outflow=0.67 cfs 0.032 af This document was created by an application that isn’t licensed to use novaPDF. Purchase a license to generate PDF files without this notice.
File revisions (1)
- Sep 29, 2026
9a66bf2e8c2d8,058,976 bytes