Supporting Documentation · Jan 22, 2025
240916_40 ERW Stormwater Report FULL
9a66bf2e8c2d4fc2c8f317ad8157caa07e5a39c6bf88816279bf04e1be4ab375Indexed text · page 3
Show all pagesStormwater Management Report | September 16, 2024 Page 1 Limitation The sole purpose of this report and the associated services performed by Colliers Engineering & Design, Inc., is to undertake a hydrologic assessment for the proposed residential development in accordance with the scope of services set out in the contract between Colliers Engineering & Design and The Waymaker, LLC. Colliers Engineering & Design derived the data in this report from a variety of sources. The sources are identified at the time or times outlined in this report. The passage of time, manifestation of latent conditions or impacts of future events may require further examination of the project and subsequent data analysis, and re-evaluation of the data, findings, observations, and conclusions expressed in this report. Colliers Engineering & Design has prepared this report in accordance with the usual care and thoroughness of the consulting profession, for the sole purpose of the project and by reference to applicable standards, procedures, and practices at the date of issue of this report. For the reasons outlined above, however, no other warranty or guarantee, whether expressed or implied, is made as to the data, observations and findings expressed in this report. This report should be read in full, and no excerpts are to be taken as representative of the findings. No responsibility is accepted by Colliers Engineering & Design for use of any part of this report in any other context. This report has been prepared on behalf of, and for the exclusive use of The Waymaker, LLC and is subject to, and issued in connection with, the provisions of the agreement between Colliers Engineering & Design and The Waymaker, LLC.
File revisions (1)
- Sep 29, 2026
9a66bf2e8c2d8,058,976 bytes