Supporting Documentation · Jan 22, 2025
240916_40 ERW Stormwater Report FULL
9a66bf2e8c2d4fc2c8f317ad8157caa07e5a39c6bf88816279bf04e1be4ab375Indexed text · page 6
Show all pagesStormwater Management Report | September 16, 2024 Page 4 1.3 Stormwater Management Facility Operations and Maintenance The long-term operations and maintenance of the proposed stormwater management facilities shall be performed in accordance with the Stormwater Management Facility Operations & Maintenance Manual prepared by Colliers Engineering & Design (under separate cover). This Manual explains how often maintenance should be performed and how long it should take for the proposed on-site stormwater management systems (porous pavement) to drain to ensure proper operation. Tables showing the data to support the listed drain times are included in the appendix of this report. 1.4 Conveyance System Pipe sizing calculations have been performed using the Rational Method and 25-year design storm for capacity verification. Calculations supporting pipe sizing are attached in the appendix of this report. Stormwater Quality As per NJDEP Regulations, stormwater management measures shall only be required for water quality control if an additional ¼ acre of regulated motor vehicle surface is being proposed on a development site. For this project, the existing motor vehicle surface area totals approximately 0.22 acres and the proposed motor vehicle surface area totals approximately 0.21 acres, which results in a decrease of 0.01 acres. Therefore, as the proposed improvements result in less than ¼ acre of new regulated motor vehicle surfaces, water quality treatment is not required. Groundwater Recharge (N.J.A.C. 7:8-5.4) To meet Township and NJDEP requirements for groundwater recharge, the proposed development is designed to maintain 100 percent of the average annual pre-construction groundwater recharge volume for the site. As the entire subject property falls within one (1) HUC-14 sub-watershed, compliance with the groundwater recharge standard is met by analyzing the site as a whole. The site is within the Passaic River Lower (Nwk Bay to Saddle) HUC-14 drainage area. The New Jersey Groundwater Recharge Spreadsheet, Version 2.0, November 2003 is utilized to calculate the post-development annual recharge deficit for the project site and annual recharge volume for each proposed BMP. The following table provides a summary of the post-development deficit and proposed recharge volume. Full calculation spreadsheets and a summary of the proposed recharge volume for each BMP
posed BMP. The following table provides a summary of the post-development deficit and proposed recharge volume. Full calculation spreadsheets and a summary of the proposed recharge volume for each BMP are provided in the Appendix. Groundwater Recharge Summary HUC-14 Drainage Area Pre-Development Total Annual Recharge (cubic feet) Proposed Annual Recharge Volume (cubic feet) Percentage of Average Annual Pre-Construction Groundwater Recharge Volume
File revisions (1)
- Sep 29, 2026
9a66bf2e8c2d8,058,976 bytes