Supporting Documentation · Jan 22, 2025
240916_40 ERW Stormwater Report FULL
9a66bf2e8c2d4fc2c8f317ad8157caa07e5a39c6bf88816279bf04e1be4ab375Indexed text · page 7
Show all pagesStormwater Management Report | September 16, 2024 Page 5 Passaic River Lower (Nwk Bay to Saddle) 97,738 126,642 129.57% As shown in the above table, the proposed development is designed to maintain 100 percent of the average annual pre-construction groundwater recharge volume for the site. Conclusion As discussed above, water quantity mitigation is provided for all watersheds for all storm events studied in accordance with NJDEP and Township of West Orange regulations. A subsurface infiltration basin was utilized to achieve the required reductions for all Design Points. Furthermore, water quality treatment is not required for this project site. As such, there should be no adverse impacts due to stormwater, on-site or off-site, as a result of the proposed development. Included in the appendix of this report is the HydroCAD output for back-up on both the existing and proposed conditions. Additionally, the aforementioned Existing and Proposed Drainage Area Maps, an Inlet Area Map and a Pipe Capacity Report are provided in the appendix of this report.
File revisions (1)
- Sep 29, 2026
9a66bf2e8c2d8,058,976 bytes