Supporting Documentation · Feb 5, 2025
172 174 Main Street West Orange Planner Report 9 24 2024
5c5b8402028ac224981f2d4ec000b3bbdcb454788c5eadfddf6db057dfdd7fb4Indexed text · page 11
Show all pagesSeptember 25, 2024 Page 11 of 11 PB-24-14 172-174 Main Street Block 89, Lot 6 105 Grove Street, Suite 3, Montclair, NJ 07042 ∙ Phone: (973) 954-2677 ∙ www.NishuaneGroup.com Recommended Conditions of Approval Should the Board be inclined to grant the requested variance relief in full or in part, or to approve the accompanying site plan, the following are recommended conditions that should be placed on the approvals. 1. The applicant shall comply with all conditions provided by the Board Engineer. 2. The applicant shall repair and restripe the parking area. 3. The applicant shall replace the existing chain-link fence and gate with a more substantial alternative such as one comprised of tubular steel or similar material. 4. The applicant shall provide testimony confirming that the trench drain across the front of the site remains operational and free of any obstruction that would impede its flow. 5. The applicant shall provide information on the exterior lighting on the site and demonstrate that there is adequate lighting on the walkway surrounding the building as well as in the parking area, to allow for safe use during both day and night hours.
File revisions (1)
- Sep 29, 2026
5c5b8402028a1,722,637 bytes