Supporting Documentation · Jan 22, 2025
PB 24 15 3135WO LLC Draft Resolution
bed8acd9b83c02a5027b700a94c7633f6336b81f190638d7e8fa7f247befe8a5Indexed text · page 10
Show all pages3135WO, LLC 11. Applicant must install and maintain a sign alerting pedestrians to the active driveway on the property which form and location must be reviewed and approved by the Downtown Alliance and Pedestrian Safety Commission. 12. The number and size of flammable material storage cabinets shall be determined by the Fire Official. 13. An additional exit door shall be added to the southerly side rear of the new construction. 14. Two (2) ventilation fans (up to 24”) shall be installed in the addition section of the building. 15. The Applicant shall list all conditions of approval onto a final site plan submission prior to the submission of the building permit. The undersigned secretary certifies the decision set forth herein was made by this Board on January 8, 2025, and memorialized herein pursuant to N.J.S.A. 40:55D10(g) on ________. ___________________________________ Jamilet Baquerizo Vite Planning Board Secretary
File revisions (1)
- Sep 29, 2026
bed8acd9b83c125,984 bytes