Supporting Documentation · Jan 22, 2025
PB 24 15 3135WO LLC Draft Resolution
bed8acd9b83c02a5027b700a94c7633f6336b81f190638d7e8fa7f247befe8a5Indexed text · page 4
Show all pages3135WO, LLC the water runoff on the subject property and grade the driveway to direct the runoff to the street and not the neighboring property. 13. The existing basement will remain the same and the new addition will allow the business to create a showroom in the front and a retail entrance on the side. (Currently, customers walk directly into the management office.) 14. There will be no additional storm water runoff as the new addition will capture the storm water and will direct it to the roof drain system. 15. The proposed addition will be built on a slab on grade and will be setback 6.25 feet and 5.3 feet from the northern and southern property lines respectively, and 30.8 feet from the western (rear) property line. 16. The area surrounding the subject property is developed with an autobody repair shop to the south and retail stores to the north and to the rear residential properties. 17. Applicant requested the following waivers from the Township Site Plan/Subdivision Checklist: Item 4- A key map at specified scale showing location of tract with reference to surrounding properties, streets and municipal boundaries within 500’ if applicable, Item 31: Existing and proposed contour intervals based on U.G.S. and G.S. datum, Item 44: Lighting Plan and details, Item 45: Landscape plans and detailed prepared by a professional landscape architect and Item 46: Solid waste management plan. 18. The Application requires the following variance relief from the Board: SECTION/REQUIREMENT PERMITTED/REQUIRED PROPOSED 25.71 Minimum side yard 6 feet each side 5’4” feet (South Side)
File revisions (1)
- Sep 29, 2026
bed8acd9b83c125,984 bytes