Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 22, 2025

PB 24 15 3135WO LLC Draft Resolution

Preserved file SHA-256bed8acd9b83c02a5027b700a94c7633f6336b81f190638d7e8fa7f247befe8a5

Indexed text · page 9

Show all pages
Page 9

3135WO, LLC 4. The Applicant shall pay all outstanding application fees and technical review fees, board attorney fees for preparation of the resolution, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of the notification or this approval shall be deemed withdrawn. 5. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. 6. Applicant agrees to abide by all of the suggestions and directives set forth in the Matrix Report dated September 6, 2024, unless expressly modified by the terms of this Resolution. 7. Applicant will abide by the Township Tree Ordinance and will plant street trees as recommended by the Forester as full or partial satisfaction of any required tree planting under the Tree Ordinance. 8. Applicant will submit an informal soil erosion plan, satisfactory to the Township Engineer, adequately detailing measures to be taken for controlling soil erosion during construction. 9. Applicant will clean out and maintain roof drainage laterals. 10. Applicant’s engineer to submit confirmation that there will be less than 5,000 sf of soil movement. If more than 5,000 sf of soil is distributed, the Applicant must apply for a soil erosion and sediment control permit from the Hudson Essex Passaic Soil Conservation District.

File revisions (1)