Supporting Documentation · Jan 29, 2025
Ordinance Amaneding and Supplementing Chapter 2 Subsecton 61 Pedestrian Advisory Board
c02da48a424a87e5dc640255d14d7f6ec38bec7f2f09f5597ae4d44f8d67d0fcIndexed text · page 27
Show all pagesMaintenance Checklist Item to be addressed Street Cleaning Snow Removal Re-striping Stormwater Management Checklist consideration Does the street cleaning include the shoulder or roadway to the curb? Are the sidewalks cleaned on a regular basis? Does snow plowing block or push snow into crosswalks, blocking clear access? Does the Municipality or County shovel out crosswalks or enforce residential requirements to clean snow from the crosswalk right of way? Can additional road uses be supported and/or safety improved by reconfiguring lanes within the same roadway width? Examples include (but are not limited to): • Lane narrowing • Lane reconfiguration • Lane reduction (road diet) • On-street bicycle parking • High-visibility crosswalks • Painted curb extension, etc. Does the maintenance plan include procedures to unobstruct drainage (e.g., inlets, curb-cuts, grates, etc.) into the green infrastructure facility? Has landscaping been maintained? Maintenance/Public Works Sign-Off Statement of Compliance yes no n/a Required description yes no If NO, please describe why (refer to Exemptions Clause) The Municipality or County roadway maintenance and snow removal plan accommodates bicyclists, pedestrians, and stormwater management installations as set forth in [municipality/county] Complete Streets Policy. Revised January 2025 26 of 26
File revisions (1)
- Sep 29, 2026
c02da48a424a2,214,197 bytes