Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 17, 2025

03_Wonder Mayfair ZBA Board Deck wout Animation V2

Preserved file SHA-2561e0c19936dba64eca574cbca9bed144b772f3b695dc9585159bdcd540b1fc950

Indexed text

Page 11

481 Eagle Rock Ave. 1.14,2024 WONDER West Orange

Page 12

WONDER West Orange 481 Eagle Rock Ave. <4 <= > ’ y <b a — > . “s i" x< Vv YFG Image-Landsat / Copernicus

Page 13

12 481 Eagle Rock Ave. 11.14.2024 WONDER West Orange

Page 14

WONDER West Orange 481 Eagle Rock Ave. <4 <= > ’ y <b a — > . “s i" x< Vv YFG Image-Landsat / Copernicus

Page 15

WONDER West Orange 11.14,2024 481 Eagle Rock Ave. 14

Page 16

WONDER West Orange 11.14.2024 481 Eagle Rock Ave. 15 Proposed Conditions ¢ Expansion of existing concrete pad * Second concrete pad ¢ New walkways * Storage shed relocation * Two (2) new 20’ refrigerated boxes w/ access walkway ¢ Enclosed refuse * Stormwater mitigation

Page 17

WONDER West Orange 11.14.2024 481 Eagle Rock Ave. 16 Operational Details Employees * 25 total employees Refuse Collection * Daily - Three (3) existing 8-yard dumpsters + two (2) waste oil tanks pumped bi-weekly Deliveries « ~7-10 deliveries weekly — Raw and dry goods * 1 delivery of finished product / day * 1 wood delivery every 2 weeks Food Preparation and Production ¢ On-site trimming of raw product ¢ Meats smoked on-site (Up to 14 hours) * Cooled and Kitted Volume ¢ ~8,000 Ibs of raw product / weekly ¢ ~5,000 Ibs of finished product / weekly

Page 19

18 . |BOHLER/

Page 20

Arce Dc Ss EAE ROKER 2A esas 1 Wonder 481 EAGLE ROCK AVE. WONDER GROUP, INC. SLE ROC ET ANNE, NLL MANCINI: — LL — meer) FLOOR PLAN AND ELEVATIONS

Page 21

| & PEMBROKE TE TMBROKE TER anil TER =" NORMANDY TER ESTMINSTER TER , SUBURBAN DR CHESHIRE TER ; EVONSHIRE TER BUCKINGHAM RD P4R8oNDp PURD i _ | PR PLEASANRVALLEY CARTERET DR PURD mr 4 DI GAETANO TER PURD gore 2 5 > > mi PARK Way g & ep nie 2 pS WOE 4

File revisions (1)