Show all pagesPage 2 A. Biddelman Property. In order to complete the soil remediation at this property, the building must be demolished because the soil impacts extend under the building foundation. Before the building can be demolished, it needed to be sampled for hazardous materials (asbestos and lead, etc.). Sampling was conducted in July 2024, January 8, 2025 and February 3, 2025. Matrix is currently waiting for the data from the February sampling event to determine if the delineation is complete so that abatement methods can be selected In addition, the building material (i.e., concrete, brick, cinder block) needed to be sampled to determine if the material can be crushed and reused on site or if it needs to be disposed of off-site. That investigation was completed on January 8, 2025. The analytical data is being evaluated and a report and recommendations will be provided. Groundwater monitoring wells are being installed currently. These wells are needed to determine the downgradient extent of the groundwater plume identified earlier in this investigation. Future remedial action on the Biddelman property, after the demolition of the building includes targeted soil excavation in areas of contamination, disposal of impacted soils, in- situ bioremediation, relocation of monitoring wells and the start of groundwater sampling from the new wells — work which can continue while the residential project is under development. B. Select-O-Flash Property With respect to the Select-O-Flash Property, an underground storage tank (UST) was removed in September 2024 and post-excavation soil samples did not identify any further contamination. In the coming year, remedial action on this property will include targeted soil excavation in areas of contamination, disposal of impacted soils, relocation of monitoring wells and the start of groundwater sampling from the new wells — work which can continue while the residential project is under development. The Alpert Group, Matrix and the Township are working diligently to complete this work so that the Alpert Group can purchase the property from the Township and commence construction of this residential project. However, under the current circumstances, we must request an extension of these approvals from May 5, 2025 to May 5, 2026. Please place this matter on an upcoming agenda. Thank you for your assistance. Scarinci &
the current circumstances, we must request an extension of these approvals from May 5, 2025 to May 5, 2026. Please place this matter on an upcoming agenda. Thank you for your assistance. Scarinci & Hollenbeck, LLC, 150 Clove Road, 9th floor, Little Falls, NJ 07424 | Phone: 201-896-4100 | Fax: 201-896-8660 | www.sh-law.com 4926-3004-0600, v. 1
File revisions (1)
- Sep 29, 2026
4ee1a276418d516,781 bytes