Supporting Documentation · Mar 12, 2025
250 252 Main Street PB 25 01 West Orange Planner Report 2 20 2025
3bdce8b6e083046025a718c2ba27aa44c78d674343d9a72f6997196a68f99b5eIndexed text
ditions that should be placed on the approvals. 1. The applicant shall comply with the recommendations provided by the Board Engineer. 2. The applicant shall provide testimony offering some context to the proposed project, including the need for the staircase and how it will service the interior use and operation of the building. Testimony should also explain whether or not this staircase
February 20, 2025 Page 11 of 11 PB-25-01 250-252 Main Street Block 114, Lot 78 105 Grove Street, Suite 3, Montclair, NJ 07042 ∙ Phone: (973) 954-2677 ∙ www.NishuaneGroup.com will be used as a means of emergency egress only, and whether it will become a regular means of ingress/egress in to and out of the building. 3. The applicant shall provide testimony describing the path that will be available to an individual once they have descended the staircase. Will they be channeled to the existing walkway between the two buildings or otherwise? 4. The applicant shall provide testimony describing any lighting or other measures that are proposed for the area where the staircase will be installed, to ensure the safety of individuals using it. 5. The applicant shall provide testimony indicating whether any part of the proposed staircase will be covered or otherwise protected from the elements? As a metal staircase is proposed, how will individuals be protected from slipping and falling when the stairs are wet?
File revisions (1)
- Sep 29, 2026
3bdce8b6e0831,828,103 bytes