PB 25 01 250 252 Main Street_Engineering Review

Preserved file SHA-256e83540a68f2d2043bb541750c9715a91bd9c13c5849c7793d6c89a75c7d967ca

Indexed text · page 2

Show all pages
Page 2

23-1345-012 – PB25-01 (Community House_250-252 Main Street) Page 2 of 2 The architectural site plan proposes a four-foot wide stair well along a portion of the southerly wall of the existing commercial building. The ground disturbance will be small as only support columns for and a new landing pad will be constructed. The impervious coverage of the site does not appear to change. 1. General 1.1. Architectural drawings, which includes an architectural site plan, were submitted. However, the site plan does not comply with the provisions of Ordinance 25-5.1, Application procedures. The applicant shall either have his professionals prepare a site plan in compliance with the Ordinance or request a waiver of this requirement. 1.2. Architectural drawings were not submitted that depict any changes to the interior of the building which would warrant the need for the additional exit and exterior staircase. 1.3. We defer to the report of the Board’s planning consultant on the proposed use of the building. 2. Demolition 2.1. The Applicant shall provide testimony regarding any demolition that will occur on site to construct the stairs along a portion of the southerly side of the building. 3. Layout 3.1. The Applicant shall provide testimony regarding the existing site conditions, proposed improvements, and conformance with applicable ordinances and regulations. 4. Grading & Drainage 4.1. While it appears there will not be any increase in impervious coverage, the Applicant’s experts shall provide testimony on the same. 4.2. The proposed stairwell may impact the elevation of the existing concrete walkway along the southerly side of the building. This walkway directs stormwater runoff away from the existing building. The Applicant’s experts shall indicate how runoff patterns will be maintained so as not to adversely impact the existing. We thank you for the opportunity to be of service to the Township of West Orange Planning Board. Please feel free to contact me directly with any questions or comments at (973) 295-3279 or via e-mail at pscott@mnwe.com. Sincerely, MATRIX NEW WORLD ENGINEERING Phillip Scott, P.E., C.M.E. Director of Urban Engineering and Development LL:PS Enclosures Cc: Dennis Petrocelli, PG – Vice President, Matrix F:\2023\23-1345 West Orange 2024 Municipal Engineering Services\012 - PB-25-01, WO Community House\Correspondence\Letters\PB-25-01 - 250-252 Main

Page 2

res Cc: Dennis Petrocelli, PG – Vice President, Matrix F:\2023\23-1345 West Orange 2024 Municipal Engineering Services\012 - PB-25-01, WO Community House\Correspondence\Letters\PB-25-01 - 250-252 Main Street_Engineering Review.docx

File revisions (1)