Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 20, 2025

2025 02 Drainage Statement Signed

Preserved file SHA-256c613621a2d756ed17b3fb3d56ea25d83617d5127913bd55ca607856f15898ce6

Indexed text · page 5

Show all pages
Page 5

VI. Water Quality Per NJAC 7:8-5.5(a), the project is not required to meet the stormwater runoff quality standards as the project results in a decrease in motor vehicle surface area. This reduction provides a decrease in total suspended solid (TSS) generation for the site, improving the quality of stormwater runoff leaving the site. VII. Conclusion In conclusion, the proposed project has been designed to ensure the safe and efficient control of stormwater runoff in a manner that will not adversely impact the existing drainage patterns or adjacent properties. The project is designed to comply with the stormwater runoff quantity and groundwater recharge requirements set forth under NJAC 7:8 and the Township of West Orange Land Use Ordinance. With this stated, it is evident that the proposed development will not have a negative impact on or within the vicinity of the site, and the increase in pervious coverage will benefit the area. MPB Realty, LLC June 2024 DEC# 1021-99-025 5 Last Revised February 2025

File revisions (1)