Supporting Documentation · Mar 12, 2025
2 5 25 WO PB Draft Minutes
59011d2ce7ecea01ed3241c14440bd692a0ee7f56019d6ec2c32a2840e42b01dIndexed text · page 11
Show all pages11 • They are providing a widen access drive width, which is approx. 33 feet from the parking lot onto Main Street. • They are providing new concrete curve returns that extends from the parking lot and into the right away on Main Street on both sides of the access drive. This is to improve the depressed curb vs. the real curb for the driveway apron to be re-established and have the appropriate depressed curb they need for that. • On the most southerly corner of the parking lot, they are proposing a site ID sign. It is within the setback criteria of the property, where 15 feet side yard is required, they show 15, and 5-foot setback is required for the sign off the right of way, and they have that. • The EV parking space offsets the 5-foot minimum requirement from the right of way of the road. • They do show site triangles for people who are exiting the site, either left or right. • Looking visually down the street, we see the site triangle does come into the property a little bit but it does not impede anyone’s vision. The site triangle for exiting the other way is not on the property at all. • They are providing trash storage for the residents on the north side of the building. There are trash storage bins. • On the south side of the property, they are providing a trash storage bin enclosure for the commercial use. • In terms of landscaping, there are trees that need to be removed that are in the front area of the parking lot within the islands that are disturbing the existing concrete. • The trees will be removed and the concrete will be replaced along with the concrete apron at the front and sidewalk. They will provide new landscaping in that area keeping in mind there is limited area for planting but they will be glad to put whatever they can around the perimeter of the property. • They would like to work with the township engineer or planner to discuss what would be most appropriate for the landscaping items. • As far as a traffic impact statement, they have not conducted a daily trip analysis of the traffic that is coming and going, but they will be glad to do one. • They can do a comparison of what’s there now vs. the now multi-use of the property. • They would like to designate parking spaces for the tenants. BOARD QUESTIONS • Chairman Bagoff stated that Matrix New World Engineering provided a report dated April 13, 2024 and asked if they had a chance
would like to designate parking spaces for the tenants. BOARD QUESTIONS • Chairman Bagoff stated that Matrix New World Engineering provided a report dated April 13, 2024 and asked if they had a chance to review that report and would you comply with all the requests from the report. Ms. Bullock said she did review it and based on her review there is nothing that they can not comply with; they will do what is required. • Mr. Guarino asked will the trash be removed by a commercial remover. Ms. Bullock said the intention is that the bins will be brought to the front street for public pickup. • Mayor McCartney asked if they are asking for variances for parking. Ms. Bullock said no, they meet all the criteria. • Mayor McCartney asked are you going to consider evergreen across the rear of the building. Ms. Bullock said yes. • Ms. Scarpa asked if there is an impact on the sewer system. Ms. Bullock said she has done a calculation, the existing sewer capacity based on the two-story commercial use is 660 gallons per day and with the residential uses, the gallons per day doubles that at 1400 gallons per day in the proposed condition so there will be an increase on the system.
File revisions (1)
- Sep 29, 2026
59011d2ce7ec238,305 bytes