DLRP File No. 0722-04-0001.1 LUP230001 Page 3 of 14 West Essex Highlands Inc. PRE-CONSTRUCTION CONDITIONS: 1. Timing: If this permit contains a condition that must be satisfied prior to the commencement of construction, the permittee shall comply with such condition(s) within the time required by the permit or, if no time specific requirement is imposed, then the permittee shall comply with such condition(s) within six months of the effective date of the permit, or provide evidence satisfactory to the Division that such condition(s) cannot be satisfied. 2. Prior to the start of any construction onsite, the permittee/owner shall record a deed notice for all stormwater management measures authorized under this permit which shall be recorded in the Office of the County Clerk or the registrar of deeds and mortgages of the county in which the development, project, project site, or mitigation area containing the stormwater management measure is located. A form of deed notice shall be submitted to the Watershed and Land Management Program (Program) for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at N.J.A.C. 7:8-5.3, 5.4, 5.5, and 5.6 and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to N.J.A.C. 7:8-5.8(d). Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the Program. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the Program is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the Program within 180 calendar days of the authorization granted by the Program. 3. Prior to the commencement of site clearing, grading, or construction onsite, the permittee shall install a sediment barrier at the limits of

Page 3

lendar days of the authorization granted by the Program. 3. Prior to the commencement of site clearing, grading, or construction onsite, the permittee shall install a sediment barrier at the limits of disturbance authorized herein which is sufficient to prevent the sedimentation of the regulated waters and regulated areas onsite and shall serve as a physical barrier protecting all regulated areas from encroachment by construction vehicles or other soil-disturbing activities. All sediment barriers and soil erosion control measures shall be kept in place and maintained throughout the duration of construction, until such time that the site is stabilized. 4. Prior to the commencement of site clearing, grading, or construction onsite, all existing trees near the project area which are not to be removed shall be marked and a protective construction fence shall be placed around each tree for the duration of construction until the site is stabilized. Headwall and outlet protection 223.8 square feet (0.005 acres) 7:13-11.2(j) Stormwater pipe 373.2 square feet (0.009 acres) 7:13-11.2(t) Trail or boardwalk 1,574.7 square feet (0.036 acres) 7:13-11.2(x) Removing existing fill and/or an existing structure 3,965.0 square feet (0.091 acres)

File revisions (1)