Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 33P: Basin 11 Elevation (feet) 590.00 590.05 590.10 590.15 590.20 590.25 590.30 590.35 590.40 590.45 590.50 590.55 590.60 590.65 590.70 590.75 590.80 590.85 590.90 590.95 591.00 591.05 591.10 591.15 591.20 591.25 591.30 591.35 591.40 591.45 591.50 591.55 591.60 591.65 591.70 591.75 591.80 591.85 591.90 591.95 592.00 592.05 592.10 592.15 592.20 592.25 592.30 592.35 592.40 Surface (sq-ft) 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 Storage (cubic-feet) 0 270 540 810 1,080 1,350 1,620 1,891 2,161 2,431 2,701 2,971 3,241 3,511 3,781 4,051 4,321 4,591 4,861 5,132 5,402 5,672 5,942 6,212 6,482 6,752 7,022 7,292 7,562 7,832 8,102 8,372 8,643 8,913 9,183 9,453 9,723 9,993 10,263 10,533 10,803 11,073 11,343 11,613 11,884 12,154 12,424 12,694 12,964 Printed 10/25/2024 Page 82
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 83 Summary for Pond 41P: Basin 10 Inflow Area = 90,349 sf, 58.79% Impervious, Inflow Depth = 2.40" for 2-Year event Inflow = 4.37 cfs @ 12.18 hrs, Volume= 18,101 cf Outflow = 2.22 cfs @ 12.08 hrs, Volume= 18,101 cf, Atten= 49%, Lag= 0.0 min Discarded = 2.22 cfs @ 12.08 hrs, Volume= 18,101 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 576.17' @ 12.35 hrs Surf.Area= 9,583 sf Storage= 1,586 cf Plug-Flow detention time= 3.9 min calculated for 18,092 cf (100% of inflow) Center-of-Mass det. time= 3.9 min ( 788.7 - 784.9 ) Volume #1 Invert 576.00' Elevation (feet) 576.00 577.00 578.00 579.00 Avail.Storage 28,749 cf Surf.Area (sq-ft) 9,583 9,583 9,583 9,583 Device #1 Routing Primary Invert 577.50' #2 Primary 576.25' #3 Discarded 576.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) Inc.Store (cubic-feet) 0 9,583 9,583 9,583 Cum.Store (cubic-feet) 0 9,583 19,166 28,749 Outlet Devices 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 42.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=2.22 cfs @ 12.08 hrs HW=576.04' (Free Discharge) 3=Exfiltration (Exfiltration Controls 2.22 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=576.00' (Free Discharge) 1=Orifice/Grate ( Controls 0.00 cfs) 2=Orifice/Grate ( Controls 0.00 cfs) Pond 41P: Basin 10 Orifice/Grate Orifice/Grate Exfiltration
POA-2 NOAA 24-hr D 2-Year Rainfall=3.44" 2024-05-12 HydroCad - Proposed POA 2B-1 Printed 10/25/2024 Page 84 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 41P: Basin 10 Hydrograph 4.37 cfs Inflow Area=90,349 sf Peak Elev=576.17' Storage=1,586 cf Flow (cfs) 4 3 Inflow Outflow Discarded Primary 2.22 cfs 2.22 cfs 2 1 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 41P: Basin 10 Stage-Discharge Total Discarded Primary 579 Elevation (feet) 578 Orifice/Grate 577 Orifice/Grate Exfiltration 576 0 10 20 30 40 50 60 70 Discharge (cfs) 80 90 100 110 120
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 85 Pond 41P: Basin 10 Stage-Area-Storage 0 Surface/Horizontal/Wetted Area (sq-ft) 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 9,500 579 Elevation (feet) 578 577 Custom Stage Data 576 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 Storage (cubic-feet) Surface Storage
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Printed 10/25/2024 Page 86 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 41P: Basin 10 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.01 0.04 0.06 0.10 0.18 1.96 0.30 0.17 0.11 0.10 0.08 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 2 5 8 12 23 219 40 22 15 13 11 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 576.00 576.00 576.00 576.00 576.00 576.00 576.02 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 Outflow (cfs) 0.00 0.01 0.04 0.06 0.10 0.18 1.69 0.31 0.17 0.12 0.10 0.08 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.01 0.04 0.06 0.10 0.18 1.69 0.31 0.17 0.12 0.10 0.08 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Printed 10/25/2024 Page 87 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 41P: Basin 10 Elevation (feet) 576.00 576.05 576.10 576.15 576.20 576.25 576.30 576.35 576.40 576.45 576.50 576.55 576.60 576.65 576.70 576.75 576.80 576.85 576.90 576.95 577.00 577.05 577.10 577.15 577.20 577.25 577.30 577.35 577.40 577.45 577.50 577.55 577.60 577.65 577.70 577.75 577.80 577.85 577.90 577.95 578.00 578.05 578.10 578.15 578.20 578.25 578.30 578.35 578.40 578.45 578.50 Discharge (cfs) 0.00 2.22 2.22 2.22 2.22 2.22 2.34 2.57 2.87 3.22 3.62 4.06 4.54 5.06 5.61 6.19 6.80 7.44 8.11 8.80 9.52 10.26 11.02 11.81 12.62 13.45 14.18 14.82 15.42 15.98 16.52 17.61 19.17 21.03 23.12 25.43 27.91 30.57 33.38 36.33 39.43 42.65 46.00 49.47 53.05 56.74 60.54 64.45 68.45 72.56 76.75 Discarded (cfs) 0.00 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.13 0.36 0.65 1.00 1.40 1.85 2.33 2.84 3.39 3.97 4.58 5.22 5.89 6.58 7.30 8.04 8.80 9.59 10.40 11.23 11.96 12.61 13.20 13.76 14.30 15.39 16.95 18.81 20.90 23.21 25.69 28.35 31.16 34.12 37.21 40.43 43.78 47.25 50.83 54.53 58.33 62.23 66.23 70.34 74.54 Elevation (feet) 578.55 578.60 578.65 578.70 578.75 578.80 578.85 578.90 578.95 579.00 Discharge (cfs) 81.05 85.43 89.90 94.46 99.11 103.84 108.65 113.54 118.51 121.80 Discarded (cfs) 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 Primary (cfs) 78.83 83.21 87.68 92.24 96.89 101.62 106.43 111.32 116.29 119.58
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Printed 10/25/2024 Page 88 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 41P: Basin 10 Elevation (feet) 576.00 576.05 576.10 576.15 576.20 576.25 576.30 576.35 576.40 576.45 576.50 576.55 576.60 576.65 576.70 576.75 576.80 576.85 576.90 576.95 577.00 577.05 577.10 577.15 577.20 577.25 577.30 577.35 577.40 577.45 577.50 577.55 577.60 577.65 577.70 577.75 577.80 577.85 577.90 577.95 578.00 578.05 578.10 578.15 578.20 578.25 578.30 578.35 578.40 578.45 578.50 Surface (sq-ft) 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 Storage (cubic-feet) 0 479 958 1,437 1,917 2,396 2,875 3,354 3,833 4,312 4,792 5,271 5,750 6,229 6,708 7,187 7,666 8,146 8,625 9,104 9,583 10,062 10,541 11,020 11,500 11,979 12,458 12,937 13,416 13,895 14,375 14,854 15,333 15,812 16,291 16,770 17,249 17,729 18,208 18,687 19,166 19,645 20,124 20,603 21,083 21,562 22,041 22,520 22,999 23,478 23,958 Elevation (feet) 578.55 578.60 578.65 578.70 578.75 578.80 578.85 578.90 578.95 579.00 Surface (sq-ft) 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 Storage (cubic-feet) 24,437 24,916 25,395 25,874 26,353 26,832 27,312 27,791 28,270 28,749
POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 89 Summary for Pond 42P: Basin 9 Inflow Area = 26,377 sf, 66.20% Impervious, Inflow Depth = 2.61" for 2-Year event Inflow = 1.55 cfs @ 12.14 hrs, Volume= 5,745 cf Outflow = 0.61 cfs @ 12.00 hrs, Volume= 5,745 cf, Atten= 61%, Lag= 0.0 min Discarded = 0.61 cfs @ 12.00 hrs, Volume= 5,745 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 562.24' @ 12.32 hrs Surf.Area= 6,534 sf Storage= 640 cf Plug-Flow detention time= 4.9 min calculated for 5,742 cf (100% of inflow) Center-of-Mass det. time= 4.9 min ( 781.7 - 776.8 ) Volume #1 Invert 562.00' Elevation (feet) 562.00 563.00 564.00 564.42 Device #1 #2 #3 Avail.Storage 6,325 cf Surf.Area (sq-ft) 6,534 6,534 6,534 6,534 Routing Primary Primary Discarded Invert 564.00' 563.00' 562.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) 15,812 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 6,534 6,534 2,744 Cum.Store (cubic-feet) 0 6,534 13,068 15,812 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 3.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads 4.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=0.61 cfs @ 12.00 hrs HW=562.03' (Free Discharge) 3=Exfiltration (Exfiltration Controls 0.61 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=562.00' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 2=Orifice ( Controls 0.00 cfs) Sharp-Crested Rectangular Weir Pond 42P: Basin 9 Orifice Exfiltration
POA-2 NOAA 24-hr D 2-Year Rainfall=3.44" 2024-05-12 HydroCad - Proposed POA 2B-1 Printed 10/25/2024 Page 90 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 42P: Basin 9 Hydrograph 1.55 cfs Flow (cfs) Inflow Area=26,377 sf Peak Elev=562.24' Storage=640 cf Inflow Outflow Discarded Primary 1 0.61 cfs 0.61 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 42P: Basin 9 Stage-Discharge Total Discarded Primary Sharp-Crested Rectangular Weir Elevation (feet) 564 Orifice 563 Exfiltration 562 0 1 2 Discharge (cfs) 3 4
POA-2 NOAA 24-hr D 2-Year Rainfall=3.44" 2024-05-12 HydroCad - Proposed POA 2B-1 Printed 10/25/2024 Page 91 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 42P: Basin 9 Stage-Area-Storage 0 500 1,000 1,500 Surface/Horizontal/Wetted Area (sq-ft) 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 Elevation (feet) 564 563 Custom Stage Data 562 0 1,000 2,000 3,000 Storage (cubic-feet) 4,000 5,000 6,000 6,500 Surface Storage
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes