Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
Preserved file SHA-256
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 346
Show all pagesPOA-2 NOAA 24-hr D 2-Year Rainfall=3.44" 2024-05-12 HydroCad - Proposed POA 2B-1 Printed 10/25/2024 Page 84 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 41P: Basin 10 Hydrograph 4.37 cfs Inflow Area=90,349 sf Peak Elev=576.17' Storage=1,586 cf Flow (cfs) 4 3 Inflow Outflow Discarded Primary 2.22 cfs 2.22 cfs 2 1 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 41P: Basin 10 Stage-Discharge Total Discarded Primary 579 Elevation (feet) 578 Orifice/Grate 577 Orifice/Grate Exfiltration 576 0 10 20 30 40 50 60 70 Discharge (cfs) 80 90 100 110 120