Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

complete drainage report rev 9

Preserved file SHA-2560e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0d

Indexed text · page 126

Show all pages
Page 126

POA-1 2024-05-12 HydroCad - Proposed POA 1B-1 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 50 Summary for Subcatchment 14S: Basin 1 - Imp Runoff = 12.98 cfs @ 12.21 hrs, Volume= Routed to Pond 16P : Basin 1 61,277 cf, Depth= 4.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NOAA 24-hr D 10-Year Rainfall=5.22" * Area (sf) 9,022 28,163 110,386 147,571 147,571 CN 98 98 98 98 Description non parking impervious Paved parking, HSG C Roofs, HSG C Weighted Average 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 59 0.0200 0.11 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.7 425 0.0650 4.10 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 3.4 516 2.50 Direct Entry, Pipe Flow (C-D) 14.1 1,000 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 14S: Basin 1 - Imp Pipe Flow (C-D)

File revisions (1)