Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 138
Show all pagesPOA-1 NOAA 24-hr D 10-Year Rainfall=5.22" 2024-05-12 HydroCad - Proposed POA 1B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 62 Summary for Subcatchment 23S: Basin 6 - Perv Runoff = 3.84 cfs @ 12.11 hrs, Volume= Routed to Pond 24P : Basin 6 10,845 cf, Depth= 2.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NOAA 24-hr D 10-Year Rainfall=5.22" Area (sf) 51,219 51,219 CN 74 Description >75% Grass cover, Good, HSG C 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 40 0.0200 1.19 Sheet Flow, Sheet Flow (A-B) Smooth surfaces n= 0.011 P2= 3.47" 3.0 450 2.50 Direct Entry, Pipe Flow (B-C) 3.6 490 Total Sheet Flow (A-B) Pipe Flow (B-C) Subcatchment 23S: Basin 6 - Perv Subcatchment 23S: Basin 6 - Perv Hydrograph Runoff 4 3.84 cfs NOAA 24-hr D 10-Year Rainfall=5.22" Runoff Area=51,219 sf Runoff Volume=10,845 cf Runoff Depth=2.54" Flow Length=490' Slope=0.0200 '/' Tc=3.6 min CN=74 Flow (cfs) 3 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes