Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 171
Show all pagesPOA-1 2024-05-12 HydroCad - Proposed POA 1B-1 NOAA 24-hr D 100-Year Rainfall=8.66" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 95 Summary for Subcatchment 15S: Basin 1 - Perv Runoff = 13.48 cfs @ 12.22 hrs, Volume= Routed to Pond 16P : Basin 1 56,178 cf, Depth= 5.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NOAA 24-hr D 100-Year Rainfall=8.66" Area (sf) 64,900 49,690 114,590 114,590 CN 80 74 77 Description >75% Grass cover, Good, HSG D >75% Grass cover, Good, HSG C Weighted Average 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 59 0.0200 0.11 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.7 425 0.0650 4.10 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 3.4 516 2.50 Direct Entry, Pipe Flow (C-D) 14.1 1,000 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 15S: Basin 1 - Perv Pipe Flow (C-D)
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes