Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 201
Show all pagesPOA-1 2024-05-12 HydroCad - Proposed POA 1B-1 NOAA 24-hr D 100-Year Rainfall=8.66" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 125 Summary for Pond 24P: Basin 6 Inflow Area = 108,077 sf, 52.61% Impervious, Inflow Depth = 7.05" for 100-Year event Inflow = 19.78 cfs @ 12.11 hrs, Volume= 63,455 cf Outflow = 11.29 cfs @ 12.16 hrs, Volume= 63,455 cf, Atten= 43%, Lag= 3.3 min Discarded = 8.27 cfs @ 11.95 hrs, Volume= 61,217 cf Primary = 3.02 cfs @ 12.16 hrs, Volume= 2,238 cf Routed to Pond 16P : Basin 1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 600.31' @ 12.16 hrs Surf.Area= 35,719 sf Storage= 4,419 cf Plug-Flow detention time= 1.4 min calculated for 63,446 cf (100% of inflow) Center-of-Mass det. time= 1.4 min ( 769.9 - 768.5 ) Volume #1 Invert 600.00' Elevation (feet) 600.00 601.00 601.42 Device #1 #2 Avail.Storage 20,288 cf Surf.Area (sq-ft) 35,719 35,719 35,719 Routing Primary Discarded Invert 600.02' 600.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) 50,721 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 35,719 15,002 Cum.Store (cubic-feet) 0 35,719 50,721 Outlet Devices 6.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=8.27 cfs @ 11.95 hrs HW=600.01' (Free Discharge) 2=Exfiltration (Exfiltration Controls 8.27 cfs) Primary OutFlow Max=3.02 cfs @ 12.16 hrs HW=600.31' (Free Discharge) 1=Sharp-Crested Rectangular Weir (Weir Controls 3.02 cfs @ 1.76 fps) Pond 24P: Basin 6 Sharp-Crested Rectangular Exfiltration Weir
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes