Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 210
Show all pagesPOA-1 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 1B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 134 Summary for Subcatchment 14S: Basin 1 - Imp Runoff = 7.73 cfs @ 1.19 hrs, Volume= Routed to Pond 16P : Basin 1 12,723 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NJ DEP 2-hr WQ Rainfall=1.25" * Area (sf) 9,022 28,163 110,386 147,571 147,571 CN 98 98 98 98 Description non parking impervious Paved parking, HSG C Roofs, HSG C Weighted Average 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 59 0.0200 0.11 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.7 425 0.0650 4.10 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 3.4 516 2.50 Direct Entry, Pipe Flow (C-D) 14.1 1,000 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 14S: Basin 1 - Imp Pipe Flow (C-D)
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes