Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
Preserved file SHA-256
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 259
Show all pagesPOA-1 2024-05-12 HydroCad - Proposed POA 1B-1 Multi-Event Tables Prepared by Anderson Consulting Services Printed 10/25/2024 Page 183 HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Events for Pond 16P: Basin 1 Event Inflow (cfs) Primary (cfs) Elevation (feet) Storage (cubic-feet) 2-Year 10-Year 100-Year WQ 11.66 20.44 41.28 8.10 0.75 3.24 12.27 0.00 544.29 544.64 545.30 543.82 35,472 51,866 83,095 13,840
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes