Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 312
Show all pagesPOA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 50 Summary for Subcatchment 52S: Basin 10 - Perv Runoff = 1.03 cfs @ 12.19 hrs, Volume= Routed to Pond 41P : Basin 10 3,908 cf, Depth= 1.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NOAA 24-hr D 2-Year Rainfall=3.44" Area (sf) 7,626 29,609 37,235 37,235 CN 80 74 75 Description >75% Grass cover, Good, HSG D >75% Grass cover, Good, HSG C Weighted Average 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 59 0.0200 0.11 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.0 210 0.0480 3.53 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 0.7 110 2.50 Direct Entry, Pipe Flow (C-D) 10.7 379 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 52S: - Perv PipeBasin Flow 10 (C-D)
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes