Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

complete drainage report rev 9

Preserved file SHA-2560e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0d

Indexed text · page 416

Show all pages
Page 416

POA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 154 Summary for Subcatchment 52S: Basin 10 - Perv Runoff = 2.19 cfs @ 12.18 hrs, Volume= Routed to Pond 41P : Basin 10 8,157 cf, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NOAA 24-hr D 10-Year Rainfall=5.22" Area (sf) 7,626 29,609 37,235 37,235 CN 80 74 75 Description >75% Grass cover, Good, HSG D >75% Grass cover, Good, HSG C Weighted Average 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 59 0.0200 0.11 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.0 210 0.0480 3.53 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 0.7 110 2.50 Direct Entry, Pipe Flow (C-D) 10.7 379 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 52S: - Perv PipeBasin Flow 10 (C-D)

File revisions (1)