Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 443
Show all pagesPOA-2 2024-05-12 HydroCad - Proposed POA 2B-1 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 181 Summary for Pond 33P: Basin 11 Inflow Area = 84,103 sf, 71.22% Impervious, Inflow Depth = 4.33" for 10-Year event Inflow = 7.47 cfs @ 12.17 hrs, Volume= 30,355 cf Outflow = 5.37 cfs @ 12.26 hrs, Volume= 30,355 cf, Atten= 28%, Lag= 5.4 min Discarded = 3.13 cfs @ 12.00 hrs, Volume= 28,464 cf Primary = 2.25 cfs @ 12.26 hrs, Volume= 1,891 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 590.37' @ 12.26 hrs Surf.Area= 13,504 sf Storage= 1,989 cf Plug-Flow detention time= 1.9 min calculated for 30,339 cf (100% of inflow) Center-of-Mass det. time= 1.9 min ( 770.5 - 768.6 ) Volume #1 Invert 590.00' Elevation (feet) 590.00 591.00 592.00 592.42 Device #1 #2 Avail.Storage 13,072 cf Surf.Area (sq-ft) 13,504 13,504 13,504 13,504 Routing Primary Discarded Invert 590.10' 590.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) 32,680 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 13,504 13,504 5,672 Cum.Store (cubic-feet) 0 13,504 27,008 32,680 Outlet Devices 5.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=3.13 cfs @ 12.00 hrs HW=590.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 3.13 cfs) Primary OutFlow Max=2.19 cfs @ 12.26 hrs HW=590.36' (Free Discharge) 1=Sharp-Crested Rectangular Weir (Weir Controls 2.19 cfs @ 1.68 fps) Pond 33P: Basin 11 Sharp-Crested Rectangular Exfiltration Weir
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes