Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 554
Show all pagesPOA-2 NOAA 24-hr D 100-Year Rainfall=8.66" 2024-05-12 HydroCad - Proposed POA 2B-1 Printed 10/25/2024 Page 292 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 41P: Basin 10 Hydrograph 13.17 cfs Inflow Area=90,349 sf Peak Elev=576.86' Storage=8,209 cf 14 13 12 Inflow Outflow Discarded Primary 11 10 Flow (cfs) 7.53 cfs 9 8 7 6 5.31 cfs 5 4 2.22 cfs 3 2 1 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 41P: Basin 10 Stage-Discharge Total Discarded Primary 579 Elevation (feet) 578 Orifice/Grate 577 Orifice/Grate Exfiltration 576 0 10 20 30 40 50 60 70 Discharge (cfs) 80 90 100 110 120
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes