Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 772
Show all pagesPOA-3 2024-05-12 HydroCad - Proposed POA 3B NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 7 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2,500 sf 100.00% Impervious Runoff Depth=3.21" Flow Length=110' Slope=0.1200 '/' Tc=4.0 min CN=98 Runoff=0.20 cfs 0.015 af Subcatchment 28S: Basin 12 - Imp Runoff Area=5,251 sf 0.00% Impervious Runoff Depth=1.20" Flow Length=110' Slope=0.1200 '/' Tc=4.0 min CN=74 Runoff=0.18 cfs 0.012 af Subcatchment 30S: Basin 12 - Perv Pond 29P: Basin 12 Peak Elev=596.18' Storage=69 cf Inflow=0.38 cfs 0.027 af Outflow=0.21 cfs 0.027 af Total Runoff Area = 0.178 ac Runoff Volume = 0.027 af Average Runoff Depth = 1.85" 67.75% Pervious = 0.121 ac 32.25% Impervious = 0.057 ac
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes