Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 845
Show all pagesProject Name West Essex Highlands Description West Orange, Essex County Recharge BMP Input Parameters Parameter BMP Area BMP Effective Depth, this is the design variable Upper level of the BMP surface (negative if above ground) Depth of lower surface of BMP, must be>=dBMPu Post-development Land Segment Location of BMP , Symbol Analysis Date 05/31/24 BMP or LID Type Pervious Pavement 6 Root Zone Water capacity Calculated Parameters Value Unit ABMP 35700.0 sq.ft dBMP 0.1 in dBMPu 23.8 in dEXC 24.0 in SegBMP 0 Parameter Empty Portion of RWC under Post-D Natural Recharge ERWC Modified to consider dEXC Empty Portion of RWC under Infilt. BMP Symbol Value Unit Recharge Design Parameters Parameter Symbol Value Unit Qdesign 0.05 in Pdesign 0.10 in ERWC 0.39 in Inches of Runoff to capture EDRWC 0.05 in Inches of Rainfall to capture RERWC 0.04 in Recharge Provided Avg. over Imp. Area 1.6 in Runoff Captured Avg. over imp. Area 2.5 in unitless Input Zero if Location is distributed or undetermined BMP Calculated Size Parameters ABMP/Aimp BMP Volume Aratio VBMP CALCULATION CHECK MESSAGES 0.31 unitless 298 cu.ft Parameters from Annual Recharge Worksheet System Performance Calculated Parameters Post-D Deficit Recharge (or desired recharge volume) Vdef Annual BMP Recharge Volume 14,828 cu.ft Post-D Impervious Area (or target Impervious Area) Aimp 113,900 sq.ft Avg BMP Recharge Efficiency 63.1% Root Zone Water Capacity RWC 2.37 in RWC Modified to consider dEXC DRWC 0.29 in Climatic Factor C-factor 1.67 no units Average Annual P Pavg 49.0 in 621,132 cu.ft %Rainfall became Runoff %Runoff Infiltrated %Runoff Recharged %Rainfall Recharged 78.5% 6.4% 0.8% 0.6% Volume Balance-> Solve Problem to satisfy Annual Recharge dBMP Check---> OK dEXC Check---> OK BMP Location---> Location is selected as distributed or undetermined Represents % Infiltration OTHER NOTES Recharged % Pdesign is accurate only after BMP dimensions are updated to make rech volume= deficit volume. The portion % of BMP infiltration prior to filling and the area occupied by BMP are ignored in these calculations. Results are % sensetive to dBMP, make sure dBMP selected is small enough for BMP to empty in less than 3 days. For land % Segment Location of BMP if you select "impervious areas" RWC will be minimal but not zero as
ensetive to dBMP, make sure dBMP selected is small enough for BMP to empty in less than 3 days. For land % Segment Location of BMP if you select "impervious areas" RWC will be minimal but not zero as determined by Recharge Requirement dr in 12.1 the soil type and a shallow root zone for this Land Cover allowing consideration of lateral flow and other losses. over Imp. Area How to solve for different recharge volumes: By default the spreadsheet assigns the values of total deficit recharge volume "Vdef" and total proposed impervious area "Aimp" from the "Annual Recharge" sheet to "Vdef" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP. To solve for a smaller BMP or a LID-IMP to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration facility and then solve for ABMP or dBMP. To go back to the default configuration clik the "Default Vdef & Aimp" button.
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes