Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

complete drainage report rev 9

Preserved file SHA-2560e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0d

Indexed text · page 889

Show all pages
Page 889

NJ DEP 2-hr WQ Rainfall=1.25" Combined FT (8-22-24) Prepared by Contech Engineered Solutions HydroCAD® 10.20-3f s/n 00447 © 2023 HydroCAD Software Solutions LLC Printed 8/26/2024 Page 24 Summary for Subcatchment 16i: Imp Runoff = 0.07 cfs @ 1.08 hrs, Volume= Routed to Pond 16FT : 4x4 FT 83 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 957 957 Tc (min) 0.6 Length (feet) 73 CN 98 Description Paved parking, HSG D 100.00% Impervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0610 2.10 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.47" Subcatchment 16i: Imp Hydrograph 0.075 Runoff 0.07 0.07 cfs 0.065 0.06 0.055 Flow (cfs) 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=957 sf Runoff Volume=83 cf Runoff Depth=1.03" Flow Length=73' Slope=0.0610 '/' Tc=0.6 min CN=98 0.01 0.005 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

File revisions (1)