Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 895
Show all pagesNJ DEP 2-hr WQ Rainfall=1.25" Combined FT (8-22-24) Prepared by Contech Engineered Solutions HydroCAD® 10.20-3f s/n 00447 © 2023 HydroCAD Software Solutions LLC Printed 8/26/2024 Page 30 Summary for Subcatchment 21i: Imp Runoff = 0.15 cfs @ 1.08 hrs, Volume= Routed to Pond 21FT : 6x4 FT 177 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 2,050 2,050 Tc (min) 0.8 Length (feet) 100 0.5 153 1.3 253 CN 98 Description Paved parking, HSG D 100.00% Impervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0500 2.07 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.47" 0.0530 4.67 Shallow Concentrated Flow, Paved Kv= 20.3 fps Total Subcatchment 21i: Imp Hydrograph 0.16 Runoff 0.15 0.15 cfs NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=2,050 sf Runoff Volume=177 cf Runoff Depth=1.03" Flow Length=253' Tc=1.3 min CN=98 0.14 0.13 0.12 0.11 Flow (cfs) 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes