Supporting Documentation · Nov 10, 2024
complete drainage report rev 9
0e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0dIndexed text · page 931
Show all pagesAppendix 1 - Filterra® Activation Checklist C:sNTECH KM ENGINEERED SOLUTIONS Project Name: Company: Site Contact Name: Site Contact Phone/Email Site Owner/End User Name: Site Owner/End User Phone/Email: Preferred Activation Date (provide 2 weeks minimum from date this form is submitted) . Landscaping Construction Throat . Final Pavement . . . Site System Size / Top Coat Complete materials / Opening Plant Species Designation ¥ ea lete / Grass Piles / Debris | Measures 4” Requested P Emerging Removed Min. Height O Yes O Yes O Yes O Yes O No O No O No O No Yes O Yes O Yes O Yes No No No O No Yes Yes Yes O Yes No No No O No Yes Yes Yes O Yes No No No No Yes O Yes O Yes O Yes O No O No O No O No O Yes O Yes O Yes O Yes O No O No O No O No O Yes O Yes O Yes O Yes No No No No Yes Yes Yes Yes No No No No Yes O Yes O Yes O Yes No O No O No O No Attach additional sheets as necessary. NOTE: A charge of $500.00 will be invoiced for each Activation visit requested by Customer where Contech determines that the site does not meet the conditions required for Activation. ONLY Contech authorized representatives can perform Activation of Filterra HC systems; unauthorized Activations will void the system warranty and waive manufacturer supplied Activation and 1st Year Maintenance. Signature Date 12 www.ContechES.com/filterra | 800-338-1122
File revisions (1)
- Sep 29, 2026
0e69db2cf67e45,040,158 bytes