Supporting Documentation · May 15, 2025
Ltr Chandler Requesting Extension 4925
a681ffc8cc71a212a3491fd5266f0c119b9958f6cbe80d2ce947f00d2ec5a69bIndexed text · page 6
Show all pagesimproved, providing nine spaces plus a credit of two additional Spaces for the electric vehicle charging spaces, there will be one space for each apartment, and that he believes the parking to be adequate because when he performed a parking survey, on four separate occasions, 8-10 spaces were open and only 5 cars were parked in the lot; that the impervious coverage is increasing but the Applicant is putting in a new drainage system, that the Application is in accordance with the Master Plan in that is provides appropriate density to an existing structure, that the Applicant will consider an all-electric new building with 300 amp service, and that the variances can be granted without substantial impairment to the public good, and that it will not impair the general purposes of the Township’s Zone Plan, Master Plan or Zoning Ordinance; and WHEREAS, members of the Board questioned the Applicant’s attorney and its witnesses; and WHEREAS, there were no questions for the Applicant’s witnesses from any member of the public and there was no public comment to the Application; and WHEREAS, the Board considered the report cf John Hess, P.E. of CME, Consulting Engineers for the Township of West Orange dated November 1, 2022, and his testimony at the hearing; and 4 {00263426.DOC}
File revisions (1)
- Sep 29, 2026
a681ffc8cc71552,388 bytes