Supporting Documentation · May 7, 2025
Stormwater Report 1
Preserved file SHA-256
78d1b4e6ebbc56232a16c000e8163bf57cdac98dcbe40e7c7304162200bff44aIndexed text · page 9
Show all pagesproposed development calls for the reconstruction of the existing parking lot, increasing the amount of landscape area by approximately 0.09 acres. The decrease in impervious also means that water quality measures are not required. The site is located in the Metropolitan Planning Area, which means that stormwater recharge is not required. 8
File revisions (1)
- Sep 29, 2026
78d1b4e6ebbc7,693,322 bytes