Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 7, 2025

M_PB Stormwater Control Ordinance

Preserved file SHA-25683326754273517395d55840ec9575439ebe77ab430deb05e476c20f6ba949f9a

Indexed text · page 3

Show all pages
Page 3

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org stormwater management system will impact an adjacent property, the outflow shall be directed to a storm sewer, swale, or other suitable stormwater runoff conveyance measure. 4) If the municipal engineer determines that the outflow from the stormwater management system may potentially damage an adjoining property and the out flow cannot be safely directed to a storm sewer, swale, or other suitable stormwater runoff conveyance measure, the stormwater runoff from the development shall be retained on-site at a rate of four inches of storage for each square foot of new impervious surface using green infrastructure practices or such other measures as may be required by the municipal engineer. 5) If the applicant cannot comply with § 25-29.9A above, the proposal should be redesigned or reduced in scope so that the stormwater management measures do not damage an adjoining property. 6) Table 8 Provides presumptive rain garden sizes that can be installed to manage New Jersey’s Water Quality Design Storm on minor developments. The SCO 2918-25 Section 29.11 was added for the requirements for a Site Development Stormwater Plan - Minor Development that provides guidelines for the submission items that are required as follows: A. Submission of Site Development Stormwater Plan 1. Whenever an applicant seeks municipal approval of a minor development subject to this ordinance, the applicant shall submit all the required components of the checklist for the site development stormwater plan at §25-29.11C below as part of the submission of the application for approval. 2. The applicant shall demonstrate that the project meets the standards set forth in this ordinance. 3. The applicant shall submit a complete electronic copy, and three hard copies of the materials listed in the checklist for site development stormwater plans in accordance with §25-29.11C of this ordinance. B. Site Development Stormwater Plan Approval. The applicant's Site Development project shall be reviewed as a part of the review process by the municipal board or official from which municipal approval is sought. That municipal board or official shall consult the Township Engineer to determine if all the checklist requirements have been satisfied and to determine if the project meets the standards set forth

File revisions (1)