Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 7, 2025

2918 25 STORMWATER 4825 Revised Final

Preserved file SHA-25627706876d850c3f5a04f25d5305977637b99380ec93428214d841ea904fb4550

Indexed text · page 17

Show all pages
Page 17

17 H. An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with § 25-29.6b. Alternative stormwater management measures may be used to satisfy the requirements at § 25-29.4P only if the measures meet the definition of green infrastructure at § 25-29.2. Alternative stormwater management measures that function in a similar manner to a BMP listed at § 25-29.4P2 are subject to the contributory drainage area limitation specified at § 25-29.4P2 for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at § 25-29.4P2 shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with § 25-29.4E is granted from § 25-29.4P. I. Whenever the stormwater management design includes one or more BMPs that will infiltrate stormwater into subsoil, the design engineer shall assess the hydraulic impact on the groundwater table and design the site, to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high-water table, to cause surficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper functioning of

Page 17

nce with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper functioning of the stormwater management measure itself. J. Design standards for stormwater management measures are as follows: 1. Stormwater management measures shall be designed to take into account the existing site conditions, including, but not limited to, environmentally critical areas; wetlands; flood-prone areas; slopes; depth to seasonal high-water table; soil type, permeability through soil testing described in Chapter 12 of the NJ BMP manual, and texture; drainage area and drainage patterns; and the presence of solution-prone carbonate rocks (limestone); 1. 2. Stormwater management measures shall be designed and demonstrated not to negatively impact wetlands or watercourses on site or adjacent to the property. 2. 3. Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate,

File revisions (1)