19 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to§ 25-29.12B5. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality. O. A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to § 25-29.4 of this ordinance and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the Essex County Register of Deeds and Mortgages, Hall of Records, 465 Martin Luther King Jr. Boulevard #130, Newark, N.J. 07102 and the Township and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with N above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with N above. P. Green Infrastructure Standards 1. This subsection specifies the types of green infrastructure BMPs that may be used to satisfy the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards. 2. To satisfy the groundwater recharge and stormwater runoff quality standards at § 25-29.4Q and R, the design engineer shall utilize green infrastructure BMPs identified in Table 1 at § 25-29.4G and/or an alternative stormwater management measure approved in

Page 19

f quality standards at § 25-29.4Q and R, the design engineer shall utilize green infrastructure BMPs identified in Table 1 at § 25-29.4G and/or an alternative stormwater management measure approved in accordance with § 25-29.4H. The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations: Best Management Practice Maximum Contributory Drainage Area Dry Well 1 acre Manufactured Treatment Device 2.5 acres Pervious Pavement Systems Area of additional inflow cannot exceed three times the area occupied by the BMP Small-scale Bioretention Systems 2.5 acres

File revisions (1)