PB 24 19 TheWayMaker LLC 40 Eagle Ridge Way Draft Resolution

Preserved file SHA-25606e8757cdf39d551a1729fb12a9c6a3c20a8b2fb90ede1fde2b508bcaaddf7f7

Indexed text · page 13

Show all pages
Page 13

13 8. Applicant’s engineer will supply the full calculations used in creating the plan modifications shown on A-1 submitted to the Board. 9. In accordance with Exhibit A-1 submitted at the hearing on April 16, 2025 by expert engineer Cokeley, the Applicant will remove the elliptical pipe in its entirety and replace it with a riprap lined ditch with stone check dams and install a double sized scour hole at the end of that ditch. Should this work to remove the concrete elliptical pipe and replace same with a riprap ditch require approvals from a municipal, county and/or state government, the Applicant will diligently file for these approvals, which filings shall not delay the work proceeding under the prior permit or on the approved stormwater management system, driveway and landscaping associated with 40 Eagle Ridge Way for which permits may proceed. 10. Applicant will install additional ground cover and landscaping as shown on A-1 submitted to the Board and as approved by the Township Forester and relocate the drainage ditch as provided in Exhibit B, subject to the terms of the Settlement Agreement. 11. The Planning Board makes no findings with respect to any work or enhancements intended to be implemented on the neighboring property located at 42 Eagle Ridge Way, other than to say that the proposed landscaping and potential drainage ditch re-location is as per the Settlement Agreement with the Llewelyn Park Board of Managers, the owner of 42 Eagle Ridge Way and Applicant and enforcement of that Settlement Agreement is between those parties. 12. The landscaping and drainage improvements identified in the exhibits to the Settlement Agreement presented and signed by Richard Cohn dated April 16, 2025

File revisions (1)