Supporting Documentation · Jul 17, 2025
exibits ZB 23 11 DeOliveira
616f896c60fe14546362d35c8b61d1925e9a421094e5519245f068388164f80dIndexed text
Kes )i | ENGINEERING, PC. | 80 Broadman Pkwy, Jersey City, NJ 07305 | Tiel: (201) 736-7546 | Email: kstengineering(@gmail.com Date: June 7", 2024 Mr. Jose M DeOliveira, Owner: 31 Bradford Avenue, West Orange, NJ 07052 Dear Sir, As your retained engineering consultant, | have visited the property located at 31 Bradford Ave. in West Orange and have carried out the analysis of the geo-grid retaining walls located on the northeast and southeast sides of the property. On visual inspection, the site drainage is proper, and the runoff flows away from the building, towards the boundary walls on the northeast and southeast sides. There is carpet grass adjacent to the boundary on both sides, and stone pavers which cover the backyard, which in turn aid in the site drainage. Also, there is no change in the grading of the site, the new boundary walls were installed in place of the existing wooden ones. The new walls are much more stable and architecturally pleasing. In view of the above, and the fact that there has not been any incidence of flooding within the building premises, a grading plan is not needed. Please note that a grading Plan requires a detailed Topographic Survey of the property, which may cost up to $5000. A waiver for the grading plan may be requested from the Township, in view of the above explanation. Thank you, MIRZA K. BAIG, PE NJPE #24GE04726600)
Exhibit G
71a Photo 1 Photo 3
Photo 7 Photo 8
Photo 11
File revisions (1)
- Sep 29, 2026
616f896c60fe9,626,758 bytes