Supporting Documentation · Jun 4, 2025
3 12 25 WO PB Draft Minutes
d1c9f350a618b12f4c8df1471f476bda50185d050f5919cdca5c51f2030f5a20Indexed text · page 10
Show all pages10 a better sheet flow even though there is no increase of water on the site. OBJECTOR’S QUESTIONS • The attorney, Robert Simon, on behalf of Llewellyn Park asked for how long have you worked for Mr. Cohn or the WayMaker. Mr. Grabowski said since 2021. • Mr. Simon asked when in 2021 did you start to work with Mr. Cohn or the WayMaker. Mr. Grabowski said sometime in June. • Mr. Simon asked when you first started working for the WayMaker in June of 2021, was that pursuant to a written contract. Mr. Grabowski said pretty much. • Mr. Simon asked when you say “pretty much”, what do you mean by that. Mr. Grabowski said it’s a family business and is told to go to the job location and start. Mr. Grabowski said he didn’t physically see anything but he presumes there’s something there. • Mr. Simon asked did the WayMaker hire you or your family company. Mr. Grabowski said yes Grabowski Construction. • Mr. Simon asked is there a written contract between the WayMaker and Grabowski Construction. Mr. Grabowski said yes or else they wouldn’t start anything. • Mr. Simon asked what was the contract for. Mr. Grabowski said for the improvements of the backyard like the pool and pool house. • Mr. Simon asked what was Grabowski Construction actually hired to do with regard to the pool and the pool house. Mr. Grabowski said site work, excavation, they did some blasting, and they did underground storm and roof drains. • Mr. Simon asked when you did the work starting in June of 2021, did you apply for a permit from the township of West Orange to do that work. Mr. Grabowski said no he didn’t, that was Mr. Cohn’s responsibility. • Mr. Simon asked do you know in what capacity did Mr. Cohn made those applications if at all. Mr. Grabowski said no. • Mr. Simon asked with regard to your work, did you have a chance to review any of the surveys or plans created with regard to any of the work performed between June of 2012 and the present. Mr. Grabowski said yes he looked at the plans. • Mr. Simon asked what plans did you look at. Mr. Grabowski said the blueprints of the pool and the pool house • Mr. Simon asked do you know which plans specifically that you reviewed. Mr. Grabowski said no. • Mr. Simon asked when you came across the 2 broken clay pipes and you stated they were not working properly and that water was going over the pipe, where was the water going. Mr. Grabowski said down the
r. Simon asked when you came across the 2 broken clay pipes and you stated they were not working properly and that water was going over the pipe, where was the water going. Mr. Grabowski said down the hill. • Mr. Simon asked did you perform any site work in the area where you replaced the 2 clay pipes with the elliptical pipes, did you do any soil disturbance in the area. Mr. Grabowski said they put rip rap. • Mr. Simon asked did soil erosion not tell you to go in and replace the clay pipes with the elliptical pipes. Mr. Grabowski said no • Mr. Simon asked soil erosion did not instruct you to engage in any disturbance of soil in connection with removal of the clay pipes and/or the installation of the elliptical pipes, correct. Mr. Grabowski said yes that is correct. • Mr. Simon asked you did not submit any plans or drawings to the Hudson Essex Passaic Soil Conservation District in connections with the removal of the pipes or the installation of the pipes. Mr. Grabowski said correct
File revisions (1)
- Sep 29, 2026
d1c9f350a618227,012 bytes