Supporting Documentation · Jul 16, 2025
PB 24 14 172 174 Main Street Draft Resolution
c15723713b0845c55653bb2521516e2d14672cf9457b3c7be14e40f8233a7640Indexed text · page 12
Show all pages5. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. 6. Applicant agrees to abide by all of the suggestions and directives set forth in the Matrix Report dated August 13, 2024, and April 1, 2025, and June 30, 2025, unless expressly modified by the terms of this Resolution. 7. Applicant will abide by the Township Tree Ordinance. 8. A white roof will be constructed. 9. The HVAC units on the roof of the building will be moved and consolidated at the front of the building (so to provide consideration to the neighbors behind the building.) 10. Applicant shall install and maintain a sound insulation partition wall to muffle the sound of the HVAC system on the roof. 11. No portion of the building may be used as an event space. 12. Applicant agrees to fully comply with the noise ordinance. 13. Applicant will mill, replace and restripe the entire parking lot. 14. The proposed lighting will not have any spillage onto neighboring properties. 15. Applicant agrees to clean out and confirm, to the satisfaction of the Township Engineer, that the existing storm water system is functioning as intended. 16. There shall be no exterior lights at the rear of the building. 17. All debris on site will be cleaned up and the site will be properly maintained free from debris.
File revisions (1)
- Sep 29, 2026
c15723713b08208,911 bytes