Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2025

PB 25 05 WO Board of Ed Mt Pleasant Elementary School Draft Resolution

Preserved file SHA-256e112e29e62398e047ee7c07bc8028d8e0b25344210ab2e795c220e49e210cbf1

Indexed text · page 4

Show all pages
Page 4

kindergarten space. The development proposed is in response to the need for additional pre-kindergarten classrooms as articulated in the Township’s Master Plan. 17. The Board finds that the proposed project and capital improvement consistent with the goals and objectives of the 2019 Master Plan Update. NOW, THEREFORE, BE IT RESOLVED by the Planning Board of the Township of West Orange that it finds the proposed project and capital improvements are consistent with the Township of West Orange Updated Master Plan. NOW, BE IT FURTHER RESOLVED by the Planning Board of the Township of West Orange that the following recommendations are made with respect to the proposed capital improvements: 1. Additional landscaping should be added to the site (in light of the increase in impervious coverage.) 2. Applicant should submit a security plan to be revised by the Police Department and which the Board urges that security cameras be installed as part of that security plan. 3. The Applicant should work with the Township Engineer such that the walkways from the proposed building to the play area should be made ADA compliant. 4. Basic Phase I testing for ground contamination should be done and the results supplied to the Township Engineer to determine if further soil testing should take place. 5. Adequate lighting on the building, drive aisle and parking lot should be installed.

File revisions (1)