Supporting Documentation · Nov 10, 2024
O16 Goll_Geoff_CV
f40d23aedef75fec4da8fb7c671398d75cabd4bbec91bf5cd1191c600cc9fac7Indexed text · page 4
Show all pagesGEOFFREY M. GOLL, P.E. 4 SCIENCE. ENGINEERING. DESIGN. and observation services. Mr. Goll is serving as the Engineer-of-Record for this project and reviewed the final engineering plans, coordinated with the Project Manager and project team, and led client coordination meetings. Princeton Walk Homeowners Association | Princeton Walk Dredging Princeton, NJ (2017-2021) Mr. Goll provided overall project management as the Engineer-of-Record for this project involving the dredging of 7,500 cubic yards of accumulated sediment from a 4-acre lake known as Promenade Boulevard Pond. Broken into three phases, the project involved data collection activities; preparation of the engineering design plans and permit materials; and bidding, construction administration, and oversight. As Engineer-of-Record, Mr. Goll provided technical review of the dredging specifications, coordinated with the Project Manager and project team, conducted construction administration, and performed inspection of the site. Abington-Reldan Metals | Building Addition Geotechnical Investigation Fairless Hills, PA (2016) Mr. Goll was Principal-in-Charge of this project in which Princeton Hydro was contracted to conduct a geotechnical investigation and foundation design for a 45,000 square foot building addition for Abington Reldan Metals. The geotechnical investigation consisted of a review of USDA Soils, USGS Surficial Geology, and USGS Bedrock Geology; development of a Geotechnical Boring Plan Design; field investigation; soils testing; subsurface profile development; shallow foundation system analysis; bearing capacity and settlement analysis; footing design; and IBC Seismic Site Characterization. Mr. Goll was responsible for overseeing all aspects of this project and acted as the point of contact for the client. Orleans Homebuilders | Earthwork Monitoring and Materials Testing for Multi-family Residential Development Lambertville, NJ (2008) Princeton Hydro was contracted to provide earthwork monitoring and materials testing for a 129-unit, multi-family residential development. The site required fills in excess of 20 feet and cuts through bedrock of 10 feet. Princeton Hydro’s role was to complete laboratory testing of soils, in-field compaction rate testing, and observation of placement and excavation of fills. Tredyffrin Township| Sinkhole Remediation in Right-of-Way Tredyffrin, Chester County, PA
atory testing of soils, in-field compaction rate testing, and observation of placement and excavation of fills. Tredyffrin Township| Sinkhole Remediation in Right-of-Way Tredyffrin, Chester County, PA (2007) Mr. Goll was in responsible charge of the investigation and remediation of karst induced sinkhole activity within the right-of-way of residential development. The cause of the sinkhole was the migration of stormwater through overburden, residual soils into a solution cavity in the underlying carbonate rock formation. To find the “throat” of the cavity, he observed the progression of a test pit to expose the bedrock and cavity, and then made recommendations for placing concrete to close off the void in the rock and directed the backfilling of soil in controlled, compacted lifts. Harbour Mansion HOA | Seawall Reconstruction for Collapsed Parking Lot on Oceanfront Long Branch, NJ (2013) Mr. Goll served as Engineer-of-Record and Project Manager for this post- Hurricane Sandy recovery project. As a result of the complete destruction of the timber seawall facing the Atlantic Ocean, Princeton Hydro was brought on as sub consultant to the Falcon Group, a civil engineering firm, to provide geotechnical engineering, regulatory permitting services, and construction observation service. Mr. Goll oversaw the subsurface investigation program, sheet pile design, and plan preparation. He also managed the regulatory permit application process and interacted with the firm’s regulatory compliance specialists and biologists during the preparation of the applications and compliance statements. After the start of construction, Mr. Goll was the client contact and worked with field staff during inspections. GreenTrust Alliance | Habitat Restoration through Thin-Layer Placement of Dredged Material Borough of Avalon and Downe Township, NJ (2017) For this project, Mr. Goll served as the Contract Manager for the projects involving the dredging of navigation channels and disposal of sediment via beneficial use. This project focused on the restoration and enhancement of interior high and low marsh, coastal dunes, and beach habitats to counteract subsidence and sea level rise. The projects were undertaken at the direction of the NJ Division of Fish and Wildlife as pilot demonstrations to determine the feasibility of beneficial reuse of thin layer dredged material placement to restore
ts were undertaken at the direction of the NJ Division of Fish and Wildlife as pilot demonstrations to determine the feasibility of beneficial reuse of thin layer dredged material placement to restore degraded wetlands. As the Contract Manager, as well the Principal-in-Charge, he provided engineering oversight, reviewing schedules, coordinating with subcontractors, and contract administration.
File revisions (1)
- Sep 29, 2026
f40d23aedef7281,987 bytes