Supporting Documentation · Nov 10, 2024
O17 West_Essex_Highlands_Geotech_Slope_Stability_Review_20250716
3e8a1ae9b82bee5e1a3ba6e4bdd4caed8935a757ada24264e7b583b1756dd9c3Indexed text · page 5
Show all pagesPrinceton Hydro, LLC Page | 5 In conclusion, the recent slope stability analysis is inadequate to assess the conditions of the subject slope at proposed Building. The parameters used only reflect the most competent locations above the top of the slope of the investigation and not the degraded bedrock conditions found in the middle slopes on the site. By also leaving out the impact of the subsurface wastewater utility line and the less competent Feltville Formation provides an unrealistic evaluation of the site and provides a false sense of security that the subject proposed Building D can be constructed without initiating landslide activity. I will be available for the July8 16, 2025 Planning Board meeting to discussion my observations and conclusions. Thank you. Sincerely, Geoffrey M. Goll, P.E. President Princeton Hydro, LLC cc: WeCare
File revisions (1)
- Sep 29, 2026
3e8a1ae9b82b696,089 bytes