Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 15, 2026

15 12 17 Katsanos Chit Chat Diner West Orange Prior Zoning Board Resolution of Approval

Preserved file SHA-256763e62d96d4921907b5960e92f80954f5399ad0452ec36d5292f56519dcaa373

Indexed text · page 14

Show all pages
Page 14

17% A waiver from the requirement to provide an environmental impact statement. 18. A waiver from item number 31 of the checklist, for existing and proposed contours intervals 200’ feet beyond the subject property. BE IT FURTHER RESOLVED that the grant of said variances shall be conditioned upon the Applicant’s full and complete satisfaction of the following conditions: 1. A super silt fence and hay bales shall be used during construction to protect the office building to the west. 2. Trees shall be planted on the fringe of the parking lot in accordance with Township Forester’s recommendation in his letter dated September 30, 2015. 3. Shrubs shall be planted along the front of Eagle Rock Plan. 4, Trees that are to be removed during construction at the cliff line to the east of the proposed parking lot shall be cut down to the stump only, all root structures are to remain in place so as not to disturb the soil. 5. Sight triangle easements at the driveway exits shall be added to the plans, and the site triangle shall be cleared of all trees. 6. The lighting plan shall be further adjusted to make the parking lot lighting as uniform as possible. Calculations of uniformity levels are to be provided to the reasonable satisfaction of the Township Engineer. 14

File revisions (1)