Supporting Documentation · Jan 15, 2026
15 12 17 Katsanos Chit Chat Diner West Orange Prior Zoning Board Resolution of Approval
763e62d96d4921907b5960e92f80954f5399ad0452ec36d5292f56519dcaa373Indexed text · page 16
Show all pagesc. A Knox box for the proposed building shall be provided in a location approved by the Township Fire Official. A note to that effect shall be published on the plans. d. The plans shall be revised to indicate the applicant sought and received the necessary input from the Township Fire Official regarding the extent and placement of any required fire zones on site. e. The site plans shall be revised to confirm that a fire suppression system will be provided, as well as information at to whether the installation of an appropriately designed backflow prevention device is required under the Safe Drinking Water Act Regulations at NJAC 7:10-10 Appendix A. f. Either a grease interceptor shall be shown inline on the proposed sanitary sewer lateral or, may be installed internally, but whichever method is selected, the installation shall be noted on the site plans and architectural plans. g.The design engineer shall develop an alternate means of providing a sanitary sewer connection should lowering the invert of the existing manhole be unfeasible, given the project’s location and the real possibility of encountering bedrock. h. The applicant’s engineer shall investigate whether the condition and construction (brick, precast concrete, etc.) of the proposed invert modifications to the existing sanitary manhole can be accomplished without a complete reconstruction of that structure, to determine whether the installation of a new structure would be more effective. i. The plans shall identify the diameter and material of the proposed water service to the new building. j.The site plans shall show the roof leader drain piping dimensions, materials and discharge locations. k. The architectural drawings shall incorporate that information presented as Exhibit A-5 depicting the proposed locations of the HVAC units as well as any necessary screening. 1. The County Engineer’s office shall be provided with a copy of the stormwater management report and mapping for their review and approval. m. A uniformity calculation shall be published on the lighting plan in any future submissions. 16
File revisions (1)
- Sep 29, 2026
763e62d96d494,649,752 bytes