« P.O, Box 236 Hopewell, NJ 08525 609-257-6705 {v} 609-374-9938 (fj info@kylemcmanus.com KMA KVYLE-4+MCMANUS ASSOCIATES POCY PLANNING DESIGN The Honorable Robert H, Gardner, J.S.C. Essex County Superior Court Historic Courthouse 470 Martin Luther King Jr., Blvd, 4th Floor Newark, New Jersey 07102 February 15, 2022 Re: IMO the Application of the Township of West Orange Docket No: ESX-£-4697-15, Dear Judge Gardner, Enclosed please find the Special Master’s Report for the Township of West Orange’s Compliance Hearing in the above referenced matter. | am available for any questions you may have and will attend the hearing. Sincerely, ZL ae Elizabeth McManus, PP, AICP, LEED AP t. Richard Trenk, Esq. Richard Hoff, £5q. ryan Plocker, Esa, Joshua Bauers, Esq.

Page 206

KMA [YUE MCHAISUS ASSOCIATES, Roucy PLANAR DESIGN SPECIAL MASTER’S REPORT FOR A MOUNT LAUREL AMENDED FAIRNESS & COMPLIANCE HEARING TOWNSHIP OF WEST ORANGE | HUNTERDON COUNTY, NEW JERSEY IMO Application of the Township of West Orange Docket No. ESX-L-4697-15 February 15, 2021 Prepared for: The Honorable Robert H. Gardner, J.$.C. Superior Court of New Jersey Historic Courthouse, Room 404 470 Martin Luther King Jr. Blvd. Newark, NJ 07102 Prepared By: ZZ Ze Elizabeth K. McManus, PP, AICP, LEED AP Neus fersay Professional Planning License to. S915

Page 207

KMA HE HMCAANUS ASLOCEMIES, TABLE OF CONTENTS 1.0 INTRODUCTION .... 2.0 BACKGROUND 3.0 CONTEXT FOR REVIEW... 4.0 WEST ORANGE TOWNSHIP’S HOUSING PLAN 5.0 CONCLUSION Township of West Orange} Racket No.; ESXL-4636-15 Fearvary 15, 2024 Campfiance Hecring

Page 208

KMA HYLE SMC MANUS ASSOCUATES, 1.0 INTRODUCTION This report has been prepared and submitted in my capacity as Special Master to assist the Court in the upcoming Compliance Hearing before the Honorable Robert H. Gardner, J.5.C. an February 18, 2021 In the Matter of the Application of the Township of West Orange, Docket No. ESX-L-4697.15. The following Report reviews and recommends whether the Township’s adapted 2020 Housing Element and Fair Share Plan (hereinafter the “Housing Plan”) is consistent with the Township's 2020 Settlement Agreement with Fair Share Housing Center (hereinafter the “2020 Settlement Agreement”), the and the accompanying Order on Fairness ond Preliminary Round 3 Mount Laurel Comptionce issued by the Honorable Robert H. Gardner, J.S.C. dated August 3, 2020 (hereinafter the “Order on Fairness”), as well as the applicable rules of the Council on Affordable Housing (hereinafter "COAH"} (N.J.A.C. 5:93}, the Fair Housing Act (N..S.A. 52:27D-301 et seq}, and relevant case law. The hearing notice adequately describes the hearing and directs comments to be distributed not later than January 11, 2021.) am not aware of any objections. 2.0 BACKGROUND The Township of West Orange has a history of affordable housing compliance. The Township received second round substantive certification fram COAH on October 11, 1995, with an extension through December 20, 2005 granted on February 9, 2005. The Township received third round substantive certification on December 9, 2009. The Township filed for Declaratory Judgment on July 21, 2015. There are two intervenors in this case - WEHI was granted intervention on December 4, 2015 and Redwood, LLC (hereinafter “Redwood”) was granted intervention on December 1, 2017. The Township executed a Settlement Agreement with Fair Share Housing Center (hereinafter “FSHC") on April 17, 2020; Redwood is a signatory to this agreement as well. The also Tawnship ex ecuted a Settlement Agreement with West Essex Highlands, Inc, (hereinafter “WEHI") on April 17, 2020. Both Settlement Agreements were approved by the Honorable Robert H. Gardner, J.S.C. via an Order on Fairness and Preliminary Round 3 Maunt Laurel Complionce dated August 3, 2020. Township of West Orange | Docket No.: ESX-L-4697-25 February 15, 2022 Compliance Hearing Poge ?

Page 209

IME HACHAAHUS ASSOCIATES, 3.0 CONTEXT FOR REVIEW This report reviews West Orange’s adopted 2020 Housing Element and Fair Share Plan against the Township’s April 17, 2020 Settlement Agreement with FSHC, the accompanying Order on Fairness dated August 3, 2020, as well as the applicable rules of the Council on Affordable Housing (hereinafter “COAH”) (NJ.A.C. 5:93), the Fair Housing Act (N.J.S.A. $2:27D-301 et seq), and relevant case law. tn doing so, this report relies upon the second round regulations of COAH (N.J.A.C. 5:93) to the greatest extent practicable, the Uniform Housing Affordability Control Rules, N.J.A.C. 5:80-26.1 et seq., the Fair Housing Act (W.J.S.A. §2:27D-301 et seq), and relevant case law. This approach encourages uniformity in the interpretation of the Mount Laurel doctrine and is consistent with both legislative and judicial directives. The Fair Housing Act (P.L. 1985, c. 222) states, “The interest of all citizens, including low and moderate income families in need of affordable housing, would be best served by a comprehensive planning and implementation response to this constitutional obligation.” (W.4.S.A, S2:27D-302(c}} Furthermore, the New Jersey Supreme Court, in Its decision in The Hills Development Co, v. Town of Bernards, 103 N) 1 (1986} (commonly known as Mount Laurel Ill} upheld the constitutionality of the Fair Housing Act, and stated, “instead of varying and potentially inconsistent definitions of total need, regions, regional need, and fair share that can result from the case-by-case determinations of courts involved in isolated Ntigation, an overall plan for the entire state is envisioned, with definitions and standards that will have the kind of consistency that can result only when full responsibility and power are given to a single entity [COAH].” (103 NJ. at 25) Lastly, in the decision, the Supreme Count also stated that to the extent that Mount Laurel cases rem ained before the courts, wary such proceedings before a court should conform wherever possible to the decisions, criteria and guidelines of the Council.” (103 N.J. at 63) On March 10, 2015, the N.J. Supreme Court delivered In the Matter of the Adoption of V.4.A.C. 5:96 and 5:97 by the New Jersey Council on Affordable Housing, 221 N.J. 1 (2025) (hereinafter “Mount Laurel! (v"). This decision acknowledged COAH’s Inability or unwillingness to adopt

Page 209

ion of V.4.A.C. 5:96 and 5:97 by the New Jersey Council on Affordable Housing, 221 N.J. 1 (2025) (hereinafter “Mount Laurel! (v"). This decision acknowledged COAH’s Inability or unwillingness to adopt constitutional rules for the so- called ‘Third Round” of municipal affordable housing compliance. In the absence of regulatory guidance from COAH or Legislative action, the decision instructs the Trial Courts to once again evaluate the constitutionality of municipal Fair Share Plans. While the Court has invalidated COAH’s attempts to promulgate Third Round rules, the Second Round rules (N.J.A.C. 5:93) are still largely intact. In fact, these rutes have been relied upon by the Trial Courts in numerous compliance and fairness hearings during the “gaps” in COAH’s rule-making since the Second Round ended in 1999. Furthermore, in the Mount Laurel IV decision the NJ Supreme Court directed the Township of West Orange { Docket No.: E5X-t-4697-15 February 15, 2077 Compliance Hearing Page 2

Page 210

KMA KYLE + MCMANUS ASSOCKATES, Trial Courts to continue to rely on the Second Round rules, with certain specific exceptions. The parties in this case have been guided by these instructions and this Report relies on COAH’s Second Round rules and established Court precedent to evaluate the Settlement Agreements before the Court. This will promote the uniformity of approach which is clearly indicated in the Supreme Court’s decisions. 4.0 WEST ORANGE TOWNSHIPS HOUSING PLAN West Orange’s Planning Board adopted the Housing Plan on December 2, 2020 and the Township Council subsequently endorsed it on January 26, 2021. The obligations and compliance mechanisms are consistent with the Settlement Agreement reached with FSHC unless otherwise noted, The Obligation and Compliance Mechanisms The Housing Plan set forth the following affordable housing obligation for the Township of West Orange * Rehabilitation Obligation: 305 units * Prior Round (1987 — 1999} Obligation: 226 ynits = Third Round {1999 - 2025} Obligation: 954 units Rehabilitation Obligation The Township will continue a municipally operated rehabilitation program for both renter and owner- occupied units that is operated by Community Action Services (CAS). Additionally, the Township will participate in the Essex County Home Improvement Program, which is limited to owner-occupied units. The municipal program is necessary for the Township to be compliant with NJAC. 5:93-5.2(f), which states rental units may not be excluded from the rehabilitation program. Acceptable operating manuals were submitted to ensure the programs meet the requirements of W..A.C. 5:93-5.2. The Township completed rehabilitations for 53 units since 2610 through the municipal program administered by CAS. The information submitted confirms the Township expended appropriate funds and brough the units up to code, as well as confirmation of other requirements, The Township should submit a sampte affordability control for the municipal program. Township of West Orange { Docket No.: E5X--4697-15 February 15, 2021 Compliance Hearing Page 3

Page 211

KMA BVLE+ MCMANUS ASSOCEATES Prior Round Obtigation The Township satisfies the 226 unit prior round obligation with a variety of family, special needs, and senior units, with the majority already constructed and currently providing affordable housing. The fallowing table provides a summary of these strategies. Satisfaction of the 226-unit Prior Round Cbligation > : . Bonus Total Project & Units Credits Credits Degnan House x 10 Q 10 Complete Federation Plaza x 92 0 92 Complete ARC of Essex Cc Wedgewood Avenue x 2 2 4 ‘omplete Easter Seal Society 8 Q 8 let 30-32 Kinsley * Complete ARC of Essex 4 Marmon Terrace x 6 6 we, Complete Merrywood Orive x 5 5 10 Complete Phase 1; Complete; 4 PRISM x x a 4 88 Phase 2: Approved. Habitat for Humanity 112 Whittlesey Ave., x 2 i) 2 Complete Units A and B Township of West Orerge | Docket No,: ESX-L-4697-15 Comphance Heorna February 15, 2021 Poye 4

Page 212

KMA HUE SAC MAMS ASSOCIATES The Township provided adequate evidence of compliance for most prior round strategies, including but not limited adopted zoning and affordability contrals. However, no, or inadequate information has been submitted for the following strategies. The Township should submit the missing information to confirm eligibility for credit. * Degnan House. The information submitted does not identify the unles which are eligible for credit or confirm affordability controls. The Township should submit the project's affordability controls and identify the units which are eligible for credit (as stated in the Housing Plan, 10 of 62 units are were occupted after April 1, 1980 and are therefore eligible for credit). * Easter Seal Society at 20-32 Kinsley St. No information has been submitted. The Township should submit the project's affordability contrals as well_as the speclal needs survey, and supporting documentation, available from COAH. » Merrywood Dr. Group Home, The Township submitted a deed far the property; however, it does not reference affordability controls or other information about the group home's operation. The Township should submit the project’s affordability controls as well as the special needs survey, and supporting documentation, available from COAX. * Habitat for Humanity, Unit 2. Affordability controls were not submitted for Unit 2, The Township should submit the affordability control for this unit. Notwithstanding the above items, the Tawnship’s satisfaction of the prior round obligation meets the applicable requirements for minimum rental units, maximum senior units, and the proper mix of income and bedroom distribution, Third Round Obligation The Township conducted a vacant land adjustment, pursuant to W.1A.C. 5:93-4.2., and it was subject to the Fairness Hearing and approved via the Court’s August 3, 202D Order on Fairness, Municipalities, such as West Orange, that do not have adequate capacity of developable land to fulfil the entirety of the affordable housing obligation are eligible for an adjustment of the obligation that reflects a realistic development potential (hereinafter “RDP”} and the unmet need, The ROP represents the portion of the new construction affordable housing obligation that can realistically be addressed with inclusionary development on lots identified as being developable in the vacant

Page 212

ROP represents the portion of the new construction affordable housing obligation that can realistically be addressed with inclusionary development on lots identified as being developable in the vacant land adjustment. The unmet need is calculated as the difference between the total obligation and the RDP. The Township's calculated ROP is 421 units, The vacant land adjustment was completed in accordance with W.LA.C. 5:93-4.2. More specifically, the Township evaluated vacant (property class 1) lands, public lands {property class 15c} and additional properties which were under-developed or otherwise may offer an opportunity far inclusionary affordable housing. Environmental constraints, such as but not limited to wetlands, and municipally owned recreation lands were excluded from generating an ROP. The Township Utilized densities between 6 and 67 du/ac and a 20% affordable housing set-aside to calculate the ROP. Township of West Crange { Docket No: ESX-4-4697-15 February 15, 2021 Complionce Hearing Page $